Project Status


PROJECT NO. n/a - RFP : Consultant to prepare Palmdale Sewer System Management Plan
Request for Proposal: Consultant to Prepare Palmdale Sewer System Management Plan
Submittals: Closed Thursday, May 15, 2008

Send written questions or requests for clarification to David Wu, Associate Engineer, Engineering Division of Public Works, 38250 Sierra Highway, Palmdale, CA 93550, Phone: (661 267-5272, Fax (661) 267-5292 E-mail: dwu@cityofpalmdale.org
Project Manager: David Wu661-267-5272
Contractor:
Project Status:

PROJECT NO. 600 - 2008 Street Resurfacing Project
PN 600, 2008 Street Resurfacing, various streets throughout the city. Grinding, paving, striping, utility adjustments, traffic control, etc.
Project Manager: Mike Livingston661-267-5312
Contractor:
Project Status:

PROJECT NO. 593 - FOCUS NEIGHBORHOOD NO. 5 - CDBG FUNDED PROJECT
This Public Works project will complete the installation of concrete sidewalks, driveways, curb and gutter, ADA ramps and cross gutters. The work may consist of, but is not limited to: Projects startup and mobilization, concrete/asphalt removals and disposals of material, construction of concrete curb, gutter, sidewalk and curb ramp, asphaltic concrete pavement, traffic control, adjustment of utility boxes/meters and construction survey and as-builts.
Project Manager: Albert Soliz 661-267-5300
Contractor: Padilla Paving
Project Status: 60% Complete

PROJECT NO. 579 - Public Safety & Community Relations Office Tenant Imp.
This Public Works project will complete: Tenant Improvements for the City of Palmdale Public Safety & Community Relations Department. Improvements include, but not limited to: asbestos abatement, demolition, office construction, painting, electrical & lighting, doors & hardware, HVAC, flooring and plumbing, located at 827-829 E. Avenue Q-9, Palmdale, CA.
Project Manager: Michael C. Livingston 661-267-5300
Contractor: Commercial Services Unlimited
Project Status: Asbestos abatement complete 100% complete Demolition - 2% complete

PROJECT NO. 520A - 40th Street Storm Drain Improvements Phase II
This Public Works project will complete 3500 linear feet of Storm Drain Pipes from Ave S-8 south to Ave S-11, along Ave S-11 to 37th Street East, South along 37th St. East to Ponderosa Way. Scope of work also includes but is not limited to: construction of storm drain system, remove and repair asphalt concrete pavement sections, traffic control, re-striping of existing striping, and other miscellaneous work.
Project Manager: Gordon Phair 661-267-5310
Contractor:
Project Status:




**DISCLAIMER**

These documents are intended for informational purposes only.

Users are cautioned that the City of Palmdale (Agency) does not assume any liability or responsibility based on these electronic files or for any defective or incomplete copying, excerpting, scanning, faxing, printing or downloading of the contract documents including, but not limited to, the notice inviting bids, bid schedule, special provisions, specifications, and plans. The City of Palmdale makes no representations as to the accuracy or completeness of these electronic files.

For official paper versions of the bidder packages including addenda, please submit your request in person or in writing to the City of Palmdale, Department of Public Works, 38250 Sierra Highway, Palmdale, CA 93550 or fax your request to 661/267-5322. Requests can be made between the hours of 8 am and 4:30 pm, Monday through Friday (except City holidays). When ordering official paper versions of the bidder packages, please arrange for proper payment and include a telephone number, fax number and P.O. Box or street address so you can receive addenda.